102-km Ernakulam-Vallathol Nagar corridor to get Keralam’s first automatic signalling system
Once completed, the signalling system is expected to increase the capacity of the existing tracks to three times its present level in the double-track corridor, where trains coming from the double-track Kottayam sector and the largely single-track Alappuzha sector jostle for space
Editorial & Syndication Notice: This story has been syndicated or published by 360 NEWS in accordance with verified fair-use, official press dissemination, and original attribution protocols. All trademarks, photos, and referenced quotes remain the property of their respective owners. For editorial corrections, press inquiries, or rights notices, contact [email protected].

