India · National
102-km Ernakulam-Vallathol Nagar corridor to get Keralam’s first automatic signalling system
Once completed, the signalling system is expected to increase the capacity of the existing tracks to three times its present level in the double-track corridor, where trains coming from the double-track Kottayam sector and the largely single-track Alappuzha sector jostle for space
Verified Timeline
No verified timeline updates.
What is your view on “102-km Ernakulam-Vallathol Nagar corridor to get Keralam’s first automatic signalling system”?
This is self-selected reader participation, not representative scientific polling.

